ANALISIS PERKIRAAN BIAYA DAN WAKTU PENYELESAIAN PEKERJAAN GEDUNG GROUND SUPPORT EQUIPMENT (GSE) MAINTENANCE BUILDING DI BANDAR UDARA JUWATA TARAKAN

-, GHOZI ANALISIS PERKIRAAN BIAYA DAN WAKTU PENYELESAIAN PEKERJAAN GEDUNG GROUND SUPPORT EQUIPMENT (GSE) MAINTENANCE BUILDING DI BANDAR UDARA JUWATA TARAKAN. ANALISIS PERKIRAAN BIAYA DAN WAKTU PENYELESAIAN PEKERJAAN GEDUNG GROUND SUPPORT EQUIPMENT (GSE) MAINTENANCE BUILDING DI BANDAR UDARA JUWATA TARAKAN. (Submitted)

[thumbnail of LAPORAN OJT II] Text (LAPORAN OJT II)
TBL15A_GHOZI_LAPORAN OJTII_2025.pdf - Published Version
Restricted to Registered users only

Download (11MB) | Request a copy

Abstract

--

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: DIII Teknik Bangunan dan Landasan
Depositing User: Mr. Ghozi -
Date Deposited: 03 Oct 2025 04:23
Last Modified: 03 Oct 2025 04:23
URI: http://repository.ppicurug.ac.id/id/eprint/533

Actions (login required)

View Item
View Item